top of page

The idea becomes reality.

Building and living on Mallorca

A house is made from MHM solid wood walls, solid wood ceilings and solid wood roofs

MHM Fenster  (2).png

Construction site equipment & earthworks

Construction site equipment includes the provision of all necessary machines, scaffolding (up to a working height of 3.00 m), vehicles, etc. for the services listed in the construction and service description up to the completion of the house. The earthworks are carried out according to plan.

Casa Moda_04_escorzo (1).jpg
VirtualReality-Feature-900x600.jpg

Demolition, civil engineering and concrete works

Do you already have an idea of what your dream house in Mallorca should look like? With our partner architects we create your house project in 3D. From the exterior and interior design to the interior, we can first transfer your construction project from the idea to a virtual world, plan it in detail and thus guarantee enormous cost security.

Do you already have an architect or a finished design? We are happy to work with the architect you trust.

Contact

floor slab or basement

 

Once the criteria required for obtaining a construction license have been defined as part of the design planning, our partner architects create the approval plan and submit it to the responsible Ajuntamiento for our customers. These criteria would be above all location, size, height, volume, as well as external or facade view.

Depending on the region on Mallorca, the approval time for obtaining the Projecto Basicos is between 6 and 18 months on average

Do you have questions about the approval process?

Contact
Blue Print
Architekt

Solid wood shell, ceiling and roof

In contrast to the German approval process, the submission of the implementation plan (work planning) to the responsible Ajuntamiento after the Projecto Basicos (basic building license) has been granted is part of the approval process.

The work planning is created in 3D and provided with the detailed planning for building services and electrical planning.   The work planning also serves as a perfect template for the work preparation of the production process of the solid wood wall wall elements.

front door, window and balcony doors,
shading

After the implementation planning, which contains all planning information, follows a timber construction or production planning based on it.  In this case, exterior and interior components are defined with superstructures - such as insulating material. In addition, the entire building is divided into individual, transportable wall elements (“elemented”). The window openings are also planned, and corresponding openings, millings and bores are provided for the later building services and component connections in the walls and precisely worked out by a CNC portal processing center. The production time for all MHM wall elements is only around one week for an average single-family house with 200-300 square meters of living space

csm_dietrichs-remote_modus_df0286180d.jpg
hun_wandmaster_2015.jpg

Raw installation of building services, electrical and plumbing

The production process of the MHM production line - from the board to the millimetre-precise, ready-to-install element - is divided into three steps:

  • Grooving and folding machine - grooving and surface shaping of the boards

  • Wandmaster - production of raw wall elements

  • Portal machining center PBA  - Finishing of the wall elements

In the first step, the dried softwood boards are grooved and levelled. Later, in the finished wall, these oblong indentations create layers of air between the layers. This means that a significantly better insulation value can be achieved than that of pure solid wood.

facade

In the second step, the grooved boards are then laid crosswise in the so-called "Wall Master", layer by layer, connected to form raw wall panels of the desired thickness. The system can automatically recognize varying board widths and position them exactly so that nailing with aluminum grooved pins is always possible take place at the board crossings and optimal static properties are guaranteed.In order to prevent the occurrence of undesirable thermal bridges from the inside to the outside, the nailing only ever penetrates two boards.The loose aluminum nails are fed into the machine individually via a specially developed system, so that no collated nails are needed, which would create a lot of waste.

HUNDEGGER_Massiv-Holz-Mauer_18-920x611.jpg
HUNDEGGER_Massiv-Holz-Mauer_18-920x611.jpg

Interior plaster and interior fittings

In the last process step, the finished raw wall panels are CNC-controlled and processed with the greatest precision into ready-to-install wall elements in accordance with the timber construction and production planning. This is done by the portal processing center (PBA) with its various units and processing axes, which means that any type of processing on the Massiv-Holz-Mauer® element is feasible.

At the beginning, the Massiv-Holz-Mauer® panels are planed or levelled. This creates a smooth wall surface. At the same time, the wall thickness is precisely worked out.
A 5-axis circular saw then formats the walls to the exact wall length and height. The tolerances here are no more than +/- 1 mm. Window and door openings are cut out with a chain saw and various milling units, and the ducts for sanitary and electrical lines are milled. This is done easily, quickly and precisely - nothing stands in the way of implementing the architectural requirements. 

The portal processing systems are equipped with the latest software. This ensures optimal use of the raw wall panels through so-called "nesting". This is the process of dividing flat MHM wall panels into smaller elements with as little waste as possible. Precise production times can also be planned.

The specially developed aluminum groove pins have a strength similar to that of wood. As a result, the cutting tools do not wear out due to the aluminum grooved pins.

Final assembly of electrical and plumbing

The wall elements are transported from the factory to the corresponding construction site in Mallorca and, depending on the size, are installed by our 3M Baleares specialists within a week.  

The necessary earthwork and civil engineering work is planned by our partner architects and carried out with local earthworkers and civil engineers.

WishMallorca is happy to make you offers for individual development packages for the turnkey completion of your dream home.

Contact
csm_Dahlen_Element_1600_1200_764be873e6.webp

Wall and floor coverings, interior doors

Do you have unusual ideas for your floor plan? Here the Massiv-Holz-Mauer® is flexible; every floor plan is feasible, there are no grid constraints. Further advantages are the freedom to choose the wall geometry, the individual facade design and the insulation standard. 

Casa Moda_04_escorzo (1).jpg
VirtualReality-Feature-900x600.jpg

Outside area, stairs, pool

Do you already have an idea of what your dream house in Mallorca should look like? With our partner architects we create your house project in 3D. From the exterior and interior design to the interior, we can first transfer your construction project from the idea to a virtual world, plan it in detail and thus guarantee enormous cost security.

Do you already have an architect or a finished design? We are happy to work with the architect you trust.

Contact

Kitchen and interior design

Once the criteria required for obtaining a construction license have been defined as part of the design planning, our partner architects create the approval plan and submit it to the responsible Ajuntamiento for our customers. These criteria would be above all location, size, height, volume, as well as external or facade view.

Depending on the region on Mallorca, the approval time for obtaining the Projecto Basicos is between 6 and 18 months on average

Do you have questions about the approval process?

Contact
Blue Print
Architekt

Landscaping and garden design

In contrast to the German approval process, the submission of the implementation plan (work planning) to the responsible Ajuntamiento after the Projecto Basicos (basic building license) has been granted is part of the approval process.

The work planning is created in 3D and provided with the detailed planning for building services and electrical planning.   The work planning also serves as a perfect template for the work preparation of the production process of the solid wood wall wall elements.

Construction acceptance, maintenance & administration

After the implementation planning, which contains all planning information, follows a timber construction or production planning based on it.  In this case, exterior and interior components are defined with superstructures - such as insulating material. In addition, the entire building is divided into individual, transportable wall elements (“elemented”). The window openings are also planned, and corresponding openings, millings and bores are provided for the later building services and component connections in the walls and precisely worked out by a CNC portal processing center. The production time for all MHM wall elements is only around one week for an average single-family house with 200-300 square meters of living space

csm_dietrichs-remote_modus_df0286180d.jpg
hun_wandmaster_2015.jpg

Raw installation of building services, electrical and plumbing

The production process of the MHM production line - from the board to the millimetre-precise, ready-to-install element - is divided into three steps:

  • Grooving and folding machine - grooving and surface shaping of the boards

  • Wandmaster - production of raw wall elements

  • Portal machining center PBA  - Finishing of the wall elements

In the first step, the dried softwood boards are grooved and levelled. Later, in the finished wall, these oblong indentations create layers of air between the layers. This means that a significantly better insulation value can be achieved than that of pure solid wood.

facade

In the second step, the grooved boards are then laid crosswise in the so-called "Wall Master", layer by layer, connected to form raw wall panels of the desired thickness. The system can automatically recognize varying board widths and position them exactly so that nailing with aluminum grooved pins is always possible take place at the board crossings and optimal static properties are guaranteed.In order to prevent the occurrence of undesirable thermal bridges from the inside to the outside, the nailing only ever penetrates two boards.The loose aluminum nails are fed into the machine individually via a specially developed system, so that no collated nails are needed, which would create a lot of waste.

HUNDEGGER_Massiv-Holz-Mauer_18-920x611.jpg
HUNDEGGER_Massiv-Holz-Mauer_18-920x611.jpg

Interior plaster and interior fittings

In the last process step, the finished raw wall panels are CNC-controlled and processed with the greatest precision into ready-to-install wall elements in accordance with the timber construction and production planning. This is done by the portal processing center (PBA) with its various units and processing axes, which means that any type of processing on the Massiv-Holz-Mauer® element is feasible.

At the beginning, the Massiv-Holz-Mauer® panels are planed or levelled. This creates a smooth wall surface. At the same time, the wall thickness is precisely worked out.
A 5-axis circular saw then formats the walls to the exact wall length and height. The tolerances here are no more than +/- 1 mm. Window and door openings are cut out with a chain saw and various milling units, and the ducts for sanitary and electrical lines are milled. This is done easily, quickly and precisely - nothing stands in the way of implementing the architectural requirements. 

The portal processing systems are equipped with the latest software. This ensures optimal use of the raw wall panels through so-called "nesting". This is the process of dividing flat MHM wall panels into smaller elements with as little waste as possible. Precise production times can also be planned.

The specially developed aluminum groove pins have a strength similar to that of wood. As a result, the cutting tools do not wear out due to the aluminum grooved pins.

Final assembly of electrical and plumbing

The wall elements are transported from the factory to the corresponding construction site in Mallorca and, depending on the size, are installed by our 3M Baleares specialists within a week.  

The necessary earthwork and civil engineering work is planned by our partner architects and carried out with local earthworkers and civil engineers.

WishMallorca is happy to make you offers for individual development packages for the turnkey completion of your dream home.

Contact
csm_Dahlen_Element_1600_1200_764be873e6.webp
bottom of page